{"id":1558,"date":"2021-05-12T10:54:18","date_gmt":"2021-05-12T04:54:18","guid":{"rendered":"https:\/\/financialherald.net\/?p=1558"},"modified":"2021-05-12T10:54:18","modified_gmt":"2021-05-12T04:54:18","slug":"bangladeshs-first-metro-train-completes-test-run","status":"publish","type":"post","link":"https:\/\/financialherald.net\/?p=1558","title":{"rendered":"Bangladesh\u2019s first metro train completes test run"},"content":{"rendered":"<p>The electric train crosses 500 metres with six coaches at the Diabari depot.<\/p>\n<p>The country\u2019s first electric train completed its maiden test run in Dhaka&#8217;s Uttara on Tuesday.<\/p>\n<p>It crossed 500 metres with six coaches during the trial run at the Diabari depot around 12 noon at a speed of 5km per hour, according to media reports.<\/p>\n<p>A driver from the Kawasaki-Mitsubishi Consortium drove the Mass Rapid Transit Line-6 (MRT-6) train to the unloading zone from a workshop. When commissioned, the trains will run at a speed of 100km\/hr.<\/p>\n<p>Road Transport and Bridges Minister Obaidul Quader virtually joined the event organized by Dhaka Mass Transit Company Ltd.<\/p>\n<p>According to the minister, the average progress of the project is 63.2% while the progress of the construction work from Uttara to Agargaon section, being implemented under the first phase, is 84.9%.<\/p>\n<p>The minister stated that the progress of the second phase (Agargaon to Motijheel) was 59.7% while the overall progress in procurement of electrical and mechanical system, rolling stock, and depot equipment was 54.4%.<\/p>\n<p>The project is being implemented at a cost of Tk22,000 crore.<\/p>\n<p>Once operational, a train will be carrying 60,000 people every hour, significantly reducing travel time. The route will have 16 stations.<\/p>\n<p>The first shipment of metro rail coaches from Japan had arrived in Dhaka on April 21.<\/p>\n<p>The Kawasaki-Mitshubishi Consortium of Japan started the construction of the 24 sets of the metro train with six coaches each, and another rescue train for the MRT-6 project in April 2019, under a Tk2,870 crore deal signed in 2017. The deal is valid until December next year.<\/p>\n<p>The first train was in April last year and the second in September. The coaches are made of reusable aluminium alloy and bulletproof glass.<\/p>\n<p>Besides, the compartments, weighing 22-28 tons, are about three metres in width and 20 metres in length, and have a long-line seating arrangement. Two of the six coaches are air-conditioned and each coach has four doors for passengers.<\/p>\n<p>Also, regenerative electric brakes are being used in the metro trains which will be operated using an automated radio communication system, even without any driver. A total of 13.80km of the viaduct has been installed with the rail track installation inside the depot already completed.<\/p>\n<p>The government hopes to begin operation on the Uttara-Agargaon route by the end of this year, but it may face delay due to the latest Covid-19 upsurge across the country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The electric train crosses 500 metres with six coaches at the Diabari depot. The country\u2019s first electric train completed its maiden test run in Dhaka&#8217;s Uttara on Tuesday. It crossed 500 metres with six coaches during the trial run at the Diabari depot around 12 noon at a speed of 5km per hour, according to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1559,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,2],"tags":[],"class_list":["post-1558","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-country","category-featured"],"_links":{"self":[{"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/posts\/1558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/financialherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1558"}],"version-history":[{"count":1,"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/posts\/1558\/revisions"}],"predecessor-version":[{"id":1560,"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/posts\/1558\/revisions\/1560"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/financialherald.net\/index.php?rest_route=\/wp\/v2\/media\/1559"}],"wp:attachment":[{"href":"https:\/\/financialherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/financialherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/financialherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}